Conceptual Estimating
The possibilities of natural disasters are always something to be prepared for. Given the fact that concrete is economical and sturdy, using it as a foundation increases the economical phases of construction. Developing an estimation not only narrows down the statistics, however, this also showcases the step-by-step plan of the pre-construction process. When it comes to gathering data, the S-BR pre-construction department has the experience and knowledge to provide accurate budgets. A conceptual estimate identifies potential cost early on, giving time to assess designs and consider alternatives for the new building. Primarily, this step needs to be considered before any specifications.
Design Assist and Value Engineering
Envisioning the design of a future structure enables collaboration and avoids design problems as well as constructability issues. S-BR has integrated a turn-key solution, which includes a smooth transition from the primary design to the installation. Faster project delivery, elimination of costs caused by inefficient designs, better control of the effects on the budget of design, and best value options are the major advantages of the S-BR pre-construction team.
Project Scheduling and Logistics Planning
The specified outline for project scheduling and logistic planning includes conceptual estimations and design assist/value engineering concepts. Before determining the project’s target cost, an initial budget limit must first be established. The project scope can be as detailed as needed, including how long the construction will take and how it will be completed. To establish the project timeframe and ensure that construction can begin on time, decision makers must validate the schedule.
Discover our Case Studies
Here is a selection of our references.
REQUEST A QUOTE
CLIENTS THAT TRUST